Guide To New Construction Homes In McKinney

February 5, 2026

Thinking about building a new home in McKinney? You’re not alone. The area is growing fast, and new communities are opening across Collin County. Still, the process can feel complex if you’re comparing builders, decoding contracts, and trying to land the right lot on a clear budget and timeline. This guide gives you a simple roadmap: where new homes are going up, how long builds typically take, how builder contracts work, what costs to expect (including MUD taxes), and how a project-managed approach helps you stay on track. Let’s dive in.

McKinney new-build map: where homes rise

New construction in McKinney tends to follow major roads and newly annexed land. You’ll see activity along the US 380 corridor and near US 75 and SH 121, where access and utilities support growth. Developers also add smaller infill projects inside city limits, including townhomes and single-family homes near established amenities.

If you want current, block-by-block detail, check these local resources:

  • City of McKinney Planning and Development for approved subdivisions and permit activity
  • Collin County Appraisal District for parcel and MUD boundary information
  • North Texas MLS new-construction filters for active and to-be-built listings
  • Builder sales centers for community maps, lot releases, and product lines

Use these checkpoints to confirm where building is concentrated and what is coming next.

Timeline and stages: what to expect

Build timelines vary by community, permit flow, weather, and the home’s stage when you go under contract. Here is the typical range:

  • Inventory homes (already built): immediate to about 60 days to close
  • Spec homes (partially built): about 1 to 4 months depending on stage
  • Build-to-order or custom: about 6 to 12 months or more depending on permits and workload

Ask each builder for a written estimate and how they handle delays. Your contract will define milestones and closing triggers.

Construction stages and touchpoints

  • Lot selection and contract: Choose your lot or a specific home. Review base price, lot premium, deposits, and estimated delivery.
  • Design selections: Visit the design center for finishes. Deadlines are set in the contract. Changes later can add cost and time.
  • Permitting and site work: Builder pulls permits and starts utilities and grading. Permit backlogs can affect start dates.
  • Foundation and framing: Slab is poured, then walls, roof sheathing, windows, and doors go in.
  • Rough-ins: HVAC, electrical, and plumbing are installed and inspected.
  • Insulation and drywall: Insulation is placed; drywall is hung and finished.
  • Interior finishes: Cabinets, counters, paint, flooring, and appliances are installed.
  • Final inspections and walk-through: Create a punch list for any remaining items.
  • Certificate of Occupancy and closing: Once approved, you close and move in.

Independent inspections that matter

Builders have their own inspections, but many buyers hire third-party inspectors for added protection. Common checkpoints include:

  • Pre-foundation or slab inspection
  • Framing or pre-drywall inspection (often the most revealing)
  • Final inspection before closing
  • Termite inspection if recommended or required

Builder contracts vs resale contracts

New-build contracts are not the same as standard Texas resale contracts. Most builders use their own forms that limit changes and define strict timelines.

Structure and negotiation

  • Builder agreement: Uses the builder’s contract and disclosures. Terms are often fixed.
  • Resale forms: Use TREC/TAR forms with broader contingencies. New-build contracts may limit or remove some protections.

Pricing and what drives the final number

  • Base price plus extras: Final price includes the base home, lot premium, elevation, and your upgrades.
  • Incentives: Builders may offer credits or rate buydowns, often tied to a preferred lender. Compare the net cost, not just the headline deal.

Deposits, change orders, and timing

  • Deposits: Expect earnest money and builder deposits at set milestones. Refund rules depend on the contract.
  • Change orders: These can carry markups and may extend the schedule. Get every change in writing with cost and timing.
  • Delay clauses: Most contracts protect the builder from weather, supply, and permit delays. Understand what happens if delivery slips.

Closing triggers and dispute terms

  • Closing: Often tied to the Certificate of Occupancy, though some lenders or builders may require earlier steps.
  • Arbitration: Many builder contracts include mandatory arbitration and limit damages. Know your options before signing.

Warranties and service after closing

  • Typical coverage: Often a 1-year limited workmanship warranty, 2-year systems coverage, and 10-year structural coverage. Get specifics in writing.
  • Punch list: Submit your punch list on time after your walk-through. Keep all records of communication and repairs.

Costs, taxes, and staying on budget

A clear budget keeps your build on track. Start with a line-item estimate and a cushion for surprises.

Build your full budget

  • Base price and lot premium
  • Design upgrades and change-order reserve
  • Closing costs and prepaid items
  • HOA initiation and ongoing dues
  • Landscape or irrigation packages if required
  • Independent inspections

Hold a contingency reserve of about 2 to 5 percent of the purchase price or a set dollar amount based on your upgrade plans. Track every change order and confirm schedule impacts before you approve it.

Understanding property taxes and MUDs

In Collin County, property tax bills typically include county, city, and school district components. Many newer communities also sit in Municipal Utility Districts. If your lot is in a MUD, you will see a separate line item on the tax bill that funds infrastructure. Verify the district, estimated tax rate, and projected annual cost for your specific lot.

Incentives and lending choices

Builder credits can be helpful, but they may be tied to preferred lenders or specific loan products. Compare the total cost of the incentive with the interest rate and fees from other lenders. The best choice is the one that lowers your overall cost over time.

A project-managed path to a smooth build

New construction has many decision points and deadlines. A structured plan reduces risk and keeps you on schedule.

Recommended workflow

  • Pre-contract: Get pre-approved, confirm your loan type, and hire a buyer’s agent experienced in new builds. Review builder reputation and references.
  • Contract and deposits: Have an expert review key terms. Organize deposits, addenda, and receipts.
  • During construction: Schedule independent inspections and keep a decision calendar for selections. Maintain a change-order log with costs and timing.
  • Pre-closing and move-in: Do formal walk-throughs and submit your punch list on time. Collect warranties, manuals, and lien waivers. Set up HOA and utilities.

Professionals to have in your corner

  • Buyer’s agent with new-construction experience
  • Real estate attorney for contract review if needed
  • Independent home inspector who handles pre-drywall and final inspections
  • Mortgage professional familiar with construction and construction-to-perm loans
  • Structural engineer if site conditions or design call for it

Quick project checklist

  • Pre-approval and contingency fund in place
  • Contract reviewed for delays, arbitration, and warranty
  • Selections schedule saved and appointments booked
  • Independent inspections scheduled at pre-drywall and final
  • Change-order log updated with written approvals
  • Final walk-through and punch list completed before closing if possible
  • Warranties and manuals received and filed
  • MUD, HOA, and tax costs verified for your lot

Common pitfalls to avoid

  • Accepting verbal promises. Get every detail in writing, including upgrade pricing and delivery dates.
  • Skipping third-party inspections. Independent checks protect you and support punch-list requests.
  • Underestimating the total cost. Include lot premiums, upgrades, MUD taxes, HOA dues, and potential change orders.
  • Missing selection deadlines. Late choices can trigger expensive changes and delays.

When you approach a build with clear milestones, documented decisions, and the right team, you protect your budget and your timeline. If you want a steady hand from lot selection to move-in, connect with Tiffany West for a project-managed new construction plan tailored to your goals in McKinney and Collin County.

FAQs

How long does a new home build in McKinney take?

  • Inventory homes can close quickly, spec homes often need a few months, and build-to-order homes commonly run 6 to 12 months or more based on permits and workload.

What is a MUD tax on McKinney new builds?

  • A Municipal Utility District funds local infrastructure and adds a separate line item on your property tax bill if your lot is within the district.

How do builder contracts differ from Texas resale contracts?

  • Builders use their own forms with fixed terms, limited contingencies, specific delay clauses, and often arbitration requirements that differ from standard TREC/TAR resale contracts.

Do I need third-party inspections on a new home?

  • Independent inspections at pre-drywall and before closing can catch issues early and provide documentation for punch-list items and warranty follow-up.

Can I use my own lender on a new build?

  • Usually yes, though builder incentives may be tied to their preferred lender, so compare the total cost including rates and fees before deciding.

What warranties do new construction homes typically include?

  • Many builders offer a 1-year limited workmanship warranty, 2-year systems coverage, and a 10-year structural warranty, with exact terms defined in your contract.